FCC Clears SpaceX to Launch Up to 1 Million Data Center Satellites
The FCC granted SpaceX the first US license for a constellation of orbiting data centers, a network of up to 1 million AI computing satellites called Starmind.
The Federal Communications Commission on Wednesday authorized SpaceX to deploy up to 1 million satellites built to work as data centers in orbit. The agency called it the first authorization in U.S. history for a constellation of data centers in space. The network, which Elon Musk’s rocket and satellite company calls “Starmind,” is meant to run artificial intelligence computing in orbit, where solar power is plentiful and the power and cooling limits facing data centers on the ground do not apply.
What the FCC approved
In its announcement, reproduced by the trade publication Light Reading, the FCC said it was granting SpaceX permission to deploy “1,000,000 orbital compute modules.” The agency said the system meets its orbital debris rules. The satellites will talk to each other and to SpaceX’s existing Starlink internet constellation mainly through laser links. Radio frequencies in the 18.8–19.3 GHz downlink and 28.6–29.1 GHz uplink bands are approved only as a backup and for emergency tracking, telemetry and command.
Brendan Carr, chairman of the FCC, described the decision as a strategic step for American technology. “This action opens a bold new frontier for the computing infrastructure needed to power America’s leadership and growth,” Carr said in a statement accompanying the order, according to Investing.com.
The grant is conditional and only partial. A summary of the order published by the financial news site Securities.io says the FCC’s Space Bureau, the division that licenses satellites, approved some parts of the request and put off others. According to that summary, the license sets deployment deadlines that SpaceX must meet or lose the authorization:
- At least one satellite operating in its assigned orbit by November 2033
- 10% of the constellation by November 2035
- Half of it by November 2038
- The full system by November 2040
The same summary says the approved orbital shells sit between roughly 500 and 1,002 kilometers in altitude. That is well below the 2,000-kilometer ceiling in SpaceX’s original proposal. SpaceX’s debris plan was found compliant only for satellites below 600 kilometers. The company must file a revised plan before it puts any satellites higher. Its request to dispose of higher satellites somewhere other than through atmospheric reentry was deferred for lack of detail. Securities.io also reported that the bureau denied petitions opposing the plan from Kuiper Systems, the Amazon satellite unit; Viasat, a satellite communications company; and the American Astronomical Society, a professional group of astronomers. The FCC’s own order was not immediately available to Economy Media, so those details could not be checked independently.
How Starmind would work
Investing.com reported that each Starmind satellite is designed for up to 250 kilowatts of peak computing power. Power would come from 210-kilowatt solar arrays made at SpaceX’s facility in Bastrop, Texas, and heat would be shed through 160-square-meter deployable liquid radiators. The satellites would process large volumes of data in orbit and then send the results back to Earth over Starlink’s laser network.
SpaceX filed the application at the end of January. The FCC accepted it for public comment in early February. The approval comes as tech companies scramble for electricity and land for the AI boom. Several others are also pursuing space-based data centers, including Google and Blue Origin, the space company founded by Jeff Bezos, The Verge reported. The FCC said it is still reviewing other orbital data center proposals and plans to decide on each quickly under its regular procedures.
Concerns from scientists and environmental groups
The plan has drawn sustained criticism. In July, a coalition of environmental and scientific groups represented by Earthjustice, a nonprofit environmental law firm, petitioned the FCC to stop licensing orbital data centers until it completes a broad environmental review, Space.com reported. The FCC has not required that kind of review for satellite companies seeking to deploy in low Earth orbit.
The groups pointed to collision debris, greenhouse gas emissions from rocket launches, pollutants released when satellites burn up on reentry, and light pollution that can affect both astronomy and wildlife. “Allowing a million orbiting data centers with no environmental review isn’t just irresponsible — it’s reckless,” Tim Whitehouse, executive director of Public Employees for Environmental Responsibility, said at the time. Ruskin Hartley, executive director of DarkSky International, warned that such projects “could permanently alter the night sky.”
For scale, Space.com noted that about 15,000 active satellites now orbit Earth, with Starlink driving most of the recent growth. A fully built Starmind network would be dozens of times larger than everything in orbit today.
What comes next
The authorization does not mean a million satellites will launch soon. The deadlines stretch into 2040, and analysts have questioned whether a network this large is technically or economically workable. SpaceX still needs separate earth-station licenses before its satellites can talk to ground gateways. It also has to resolve the open debris questions before it can use higher orbits. Environmental groups have said they are prepared to go to court over the lack of an environmental review. “If we have to sue so that they comply, we will,” Jan Hasselman, a senior attorney at Earthjustice, told Space.com in July.


